LEAFS: market-based flexibility control can trigger problems in low voltage grids

A report from the Austrian LEAFS project will examine solutions for avoiding problems in low voltage grid networks that may be caused by market-based incentives to manage flexible load.

CONTINUE READING

Login or register for unlimited FREE access

Login Register